What do the measures in Design Yield mean?
This article defines each measure in Design Yield so it's easy to understand.
Yield Variation
Mix Design Code
The Code representing the mix design.
Mix Design Name
The descriptive name related to the mix code.
Plant Name
The plant that the mix code belong too.
Production Volume
The annual production volume of the mix design.
Yield Volume
The calculated theoretical design yield based off the raw materials and design air % in the mix.
Air(%)
The theoretical air content in the mix design.
Yield Variation
The difference between the calculated design yield volume and the target yield volume. For imperial producers this target is 27 ft³, for metric producers this target is 1000 L. (+ values are over yielding mixes, - values are under yielding mixes).
Yield Variation Cost($)
The annualized impact of producing a mix that is over or under yielded based off the yield variation and the cost base amount in the dashboard settings.
Mix Design Details
Air Volume
The Volume the design air % occupied in 1 cube of concrete.
Material Volume
The volume of all raw materials occupied in 1 cube of concrete
Material ID
The raw material name in mix design.
Quantity
The quantity of each raw materials in the mix design.
Specific Gravity
The specific gravity of the raw material.
Volume
The volume each raw material occupies in the mix design.

